| Description of machine or
plant: |
|
|
| Description of raw material
used: |
|
|
| Description of final
products: |
|
|
| Description of capacity: |
|
|
| Year of production: Year of reconditoning: |
|
| Net price, ex location: (Euro or US-Dollar) |
|
| Cost for dismantling: (Euro or US-Dollar) |
|
| Cost for packing and
loading (truck / sea container): |
| (Euro or US-Dollar) |
|
| For freight calculation:
required number of |
| 40 feet containers: or |
| 20 feet containers: or |
| 12m
trailers: |
|
| Inspection of the
machine or plant: |
|
| Location (Country): |
|
| Line still in
production:
Line out of operation, but
still in position: |
| Line already
dismantled:
Line already packed: |
|
| Line as described
above available when: |
|
| Note: |
|